86-571-83513788 |    inquiry@putianhouse.com
 HOME  |  360° FACTORY VR  |    CONTACTS  |    INQUIRY NOW
Home » Products » Container House » Custom-made » Prefabricated living prefab container house
Container House

Project & Case Studies

Prefabricated living prefab container house

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button
Model Number: Prefab container house
Availability:
Quantity:
lace of Origin:                Zhejiang, China (Mainland)
Brand Name:                 PTH
Model Number:             Prefab Container House 
Material:                         Steel structure + Sandwich panel
Use:                                 Hotel, House, Kiosk,Booth, Office, Sentry Box,Guard House, Toilet,Shop, Villa
Steel:                               All steel members galvanized
Wall system:                 Cement board+glass wool+gypsum board
Roof:                               EPS sandwich panel
False ceiling:                 Gypsum board
Floor/foundation:         Plywood + laminated floor
Window:                         PVC single glass sliding window
Door:                               Steel security door or sandwich panel door
Electricity:                     Custom made
Size:                                Customized- made
Color:                              White,blue,gray,red,camouflage ec


PTH container house is a kind of modular house, consisting of light steel frame and thermal insulation material. It is a new type of energy conservation and environment protection house which is easy and convenient to install. PTH container house is CE, BV&TUV certified, have been exported to more than 70 countries all over the world ( such as Brazil, South Africa, Dubai, Japan etc.)


Model PTJ-10*20A
size 6058mm*2438mm*H2591mm
Exterior steel door 860mm*2050mm
Door exterior steel door :860mm*2050mm;Interior sandwich door size: 700mm*2000mm
Wall system 75mm EPS sandwich panel
Pvc single glass sliding window size 880mm*1100mm; 800mm*400mm(figured glass)
Floor bedroom---plywood + laminated floor; bathroom---cement fiber board + PVC floor
Electricity 2 lights, 1 switches, 2 sockets, one set of distribution box and breaker
Material

All steel members galvanized

Electricity: custom made
Usage classroom, dorm, hotel, living house
Our advantages are:
1. Easy installation, widely used in the construction sites, temporary residence, shower room, kitchen, teaching building, office, cold storage house, switch board room, and military camouflaged house etc.
 
2. Apply to extreme climate area. Its wind resistance can reach 210km/h, and the seismic resistance can be more than Grade 8.
 
3. Various choices for clients. Besides the standard 20’ container house, PTH can also offer you 10’, 16’, 40’ container house or combined ones. It can be stacked up to 4 layers in the vertical. And it can be combined with any quantity or any position in the horizontal.

Roof and base pod

Roof pod Base pod
Image
Corner part H=160mm Corner part H=180mm
Main beam T=3mm, galvanized and painted Main beam T=3mm, galvanized and painted
Conduit 25mm PPR Floor deck Fiber cement, T=18mm
Faceplate T=0.426 Floor T=2mm PVC
Insulation 70mm injected PU, density=40kg/m3 Insulation Fiber glass T=70~100mm, density=12kg/m3, optional
Electricity 6 ways Distritution box, 2 breakers, 2 lights Baseplate T=0.42mm steel plate
Weight 350kgs Weight 850kgs
Loading 1kN/m2 Loading 1kN/m2
Post and wall panel
PARTS Post Wall Panel
Image
Size H=2266mm Size W1155*H2300*T75~100mm
Weight 24kgs Insulation EPS/PU/Minal wool, T=50~75~100mm
Packing 2pc/carton, each carton 50kgs Faceplate T=0.426~0.5~0.6mm
Bolts M10*20 bolts for connection Treatment 50/50g/m2 Zinc-Alu. Galvanized, 20/20um PE painting
Material Q345 Door & Window Door: W900*H2050mm; Window: W800*H1100mm, preinstalled into the wall panels


Cable Preinstalled
 


Checking&Packaging
1.Checking
Carefully check the shipping list. making sure no mistake.
 
2.Packing
Option one: a standard container house packed in one flat pack, 4 sets combined into one package. It can        be shipped on board just as one 20' shipping container, The package will be protected by plywood boards      around and thin film wrapped.
 
Option two:  mixed packaging. Roof and chassis will be packed together with bolts; all the wall panels          packed together with wooden pallet in the bottom, corrugated board on the surface, and XPS board in the interspace. It will be shipped in 40' container.
 
 
Loading&Shipment
1. Flat packs will be one package it can be shipped on board just as one 20 shipping container.
2. Mixed packaging: top and bottom packed together with bolts, all the wall panels packed together on wodden pallet. wrapped by corrugated board on the surface. and XPS board between panels. The package it will be then shipped in 40' shipping container

packing
1. Do you provide on-site installation service?
1) Only large projects provide installation services
2) General projects, we can provide Installation guide service based on customers’ request.
3) Installation supervision charge standard: 150USD/day, customer should responsible for the travel fee, accommodation, translation fee, and ensure staff’s health and safety.
 
2.What’s your delivery time? 
Salesman will confirm the time accordingly, large order should communicate with order management department in advance. Normally, delivery time is 45days after receive deposit. Large order delivery time should be arranged separately.
 
3.How to control the quality of your product?
a. quality of the design: think about possible problems in advance and provide a high quality design solution.
b. quality of the raw material: choose the qualified raw material
c. quality of the production: precise manufacturing technique, experienced workers, strict quality inspection.
 
4. How to deal with quality problems?
Warranty is 3 years. Within the warranty period, PTH will responsible for all quality problems caused by production.
 
5. If there is a clear service life of your products? If have, how long?
Under conventional climate and environment, steel structure whole building 10 years, main structure 15 years, protecting system 10 years. 
 
6. What designs do you have in different climates (How can the products adopt to different climates)?
Strong wind region:   improve the wind-resisting ability of the internal structure.
Cold region: increase the thickness of the wall, or use good insulation material, improve anti-pressure ability of the structure.
High corrosion region: use corrosion resistant material, or paint anticorrosive coating.
Previous: 
Next: