86-571-83513788 |    inquiry@putianhouse.com
 HOME  |   CONTACTS  |    INQUIRY NOW
Home » News » Steel Building Types PTH Manufactured » Steel Structure Hotel

Who We Are

Steel Structure Hotel

Today, many hotels are being constructed out of prefabricated steel framing systems rather than traditional wood or expensive and time-consuming concrete. The biggest difference with steel-framed hotels – especially ones constructed off-site to precise specifications – is that they require significantly less manpower and materials, not only for the installation of the structure itself but also for the installation of other building systems and finishes.


steel structure hotel on site installation  steel structure hotel on site installation-3

steel structure hotel on site installation-1  steel structure hotel on site installation-4


Project Overview

Project Location: Gabon, Africa

Building area:9350㎡

Project usage:hotel

In order to prepare for the coming African Cups of Nations and offer excellent accommodation and

facilities for visitors, Gabon Government contacted PTH to build 5-star multi-functional luxury hotel that meet

their local standards in both Libreville and Franceville.


steel structure hotel rendergraph


PTH steel structure hotel


Project Design

PTH offered whole solutions to fully functional hotels in developing countries.

The hotel in Libreville was the same as the hotel in Franceville in appearance, structure, layout and feature.The hotel is composed by 2 buildings (3 floors) and 3 outbuildings (1 floor) with the total size of 9350 square meters.


PTH steel structure hotel design

PTH steel structure hotel design-1 PTH steel structure hotel design-2


Detail Design

PTH steel structure hotel detail design PTH steel structure hotel detail design-1 PTH steel structure hotel detail design-2


In the beginning of cooperation process, PTH proposed a bilateral stream of collaboration that ensures every details the client concerned was transferred to the drawings.
 

PTH team of experienced designers and sales stuff added value through problem finding and problem solving in the planning stage, They design room layout including suites, chambers, and the layout of various functional areas like lobby, restaurant, bar, kitchen, service room, luggage room, office room, changing rooms, massage room, gym room, sauna, computer room, Laundry room, generator room, toilets. Besides the layout design and structural engineering, PTH also took charge of water supply&drainage system, electrical power system and HVAC system.


steel structure hotel structure view


Manufacturing Process

Our material meet civil construction standards about insulation and fire-proof under severe cold environment. All the wall panels are rock wool sandwich panel with steel sheet(Baosteel brand) the thickness of interior wall reach to 60mm,exterior wall reach to 75mm, the aisle wall reach to 100mm.Window in interior wall is aluminum single-glazed, in exterior wall is aluminum double-glazed. Base frame is composed of box beam structure and casting parts. Floor panel is waterproof laminate sheathing floor and PVC floor, with glass wool insulation. Roof frame is composed of box beam structure,reinforced steel truss as secondary beam, insulation in roof is PU which is 75mm of thickness resulting in the advantages of excellent thermal insulating effect. In particular, washroom uses stainless steel wall panels to prevent rust or corrosion.


steel structure hotel manufacturing process

steel structure hotel manufacturing process-1



On Site Installation

steel structure hotel on site construction


The most challenge part for PTH is the timeline. That is, only 8 months were left for PTH, from beginning to finish of the whole project. Considering the lack of labor forces and other uncertainties, PTH sent a team consists of 3 project managers, 2 translators and 138 builders offering construction services. It took 5 months to finish installation and decoration work to enable visitors to check in immediately.


steel structure hotel on site construction-1


Achievement

PTH is one of the best turn-key solution provider for large-scale projects which require for efficiency and functionality.


finished steel structure hotel

finished steel structure hotel-1 finished steel structure hotel-2 finished steel structure hotel-3

 

steel structure hotel detailed structure size drawing

steel structure hotel detailed structure size drawing-1

steel structure hotel detailed structure size drawing-2

steel structure hotel detailed structure size drawing-3

steel structure hotel detailed structure size drawing-4


Our Divisions

Send us a Message

Copyright  © 2008-2017 Zhejiang Putian Integrated Housing Co., Ltd. All rights reserved.  Sitemap  Container House Projects