86-571-83513788 |    inquiry@putianhouse.com
 HOME  |   CONTACTS  |    INQUIRY NOW
Home » Products » Projects Case&Studies » Container House Projects » Container house mining camp in Kazakhstan

Multi-story Building

Container house mining camp in Kazakhstan

Share to:

Container house mining camp
Project time:2015.4 -2015.12
Project Location: Aktogai,Kazakhstan
Category: Mining camp housing project
Product type: Container house

  • PTH

Container house mining camp

Project Overview

Project time:2015.4 -2015.12 

Project Location: Aktogai,Kazakhstan

Category: Mining camp housing project

Product type: Container house

Located in the easten mining area of Kazakhstan , in order to solve workers' accommodation problems, Kazakhstan conducted mining camp housing cooperation project with China which realizes maximum capacity of 1000 people  with an area of about 35,000 square meters.

1

PTH was chosen as the turn-key solution provider to enable quick and efficient manufacture of all the container houses.We provide turn-key solution including project design, detail design, prefabrication, constrution service.
team

Project Design

All of the container houses are designed one-storey structure, featured in heat preservation and insulation, and the dimension of most units is 2880MM * 9144MM * 2991MM.
 

The whole project is consist of 1550 container house in which it forms dormitories of workers and managers,recreation centre, living facilities include dining hall, washhouse, emergency room, supporting facilities include waiting room, prayer room, logistical and security centre. PTH offer innovative solutions to fully functional community in mining area.

 

Detail Design
3
Manufacturing Process

Our material meet civil construction standards about insulation and fire-proof under severe cold environment.All the wall panels are rock wool sandwich panel with steel sheet(Baosteel brand) the thickness of interior wall reach to 60mm, exterior wall reach to 75mm, the aisle wall reach to 100mm.Window in interior wall is aluminum single-glazed, in exterior wall is aluminum double-glazed. Base frame is composed of box beam structure and casting parts. Floor panel is waterproof laminate sheathing floor and PVC floor, with glass wool insulation. Roof frame is composed of box beam structure,reinforced steel truss as secondary beam,insulation in roof is PU which is 75mm of thickness resulting in the advantages of excellent thermal insulating effect.In particular, washroom uses stainless steel wall panels to prevent rust or corrosion.

5 6

Prefabricate And Assemble Process
7

Offsite Assemble
8
Products Delivery

On Site Installation

As all the container houses are assembled offsiteto form easy-to-erect panels, the full frame could be

delivered to the site and simply bolted together on location with huge time savings on this construction 

project. PTH provided a zero-waste solution and a low-carbon alternative to traditional concrete frames.

91011

Achievement
12

13

Cai Lin, On-site project manager, who is the professional in charge of installation, comments: "We are proud that we were able to play a leading role and supply a multi-functional community solution in mining area. We smooth the way for copper mining project in Kazakhstan by providing better living conditions for workers and managers."

14


Our Divisions

Send us a Message

Copyright  © 2008-2017 Zhejiang Putian Integrated Housing Co., Ltd. All rights reserved.  Sitemap Prefabricated Building Manufacturer