The Color Steel Tile Roof Construction Plan of The Steel Structure Workshop

Publish Time: 2021-02-01     Origin: Site

With more and more steel structure as the main structure of buildings, various types of prefab steel buildings and steel structure materials have been derived. Steel structure workshops are very convenient for some workshops that require large-scale machine production. The steel structure workshop has a large span and vast space, which can meet the production requirements.



Key control points of color steel tile roof engineering:


1. Due to the large slope of the roof and a large number of ridges, the elevation of the roof ridge beam, cornice, start and end points of the watershed must be accurately controlled during the construction process. For slope shadow line, slope sun angle line, cornice line, the positioning of the corner points, and the starting and ending points of the watershed must be accurate. When scaffolding is set up and removed, construction safety should be paid attention to, and the construction should be carried out normally.


2. The slope of the roof is relatively large. During the grassroots treatment and tile installation, the workers must be strictly informed about the safety technology and take safety protection measures.


3. Strictly control the arrangement of the color steel tiles. The internal corners, external corners, end tiles and the junction with the roof structure must be handled well to prevent water leakage.


4. Safety guardrails and safety nets or other protective measures to prevent falling must be installed around the roof and reserved holes.


Zhejiang Putian Integrated Housing Co., Ltd. (also known as "PTH") has been dedicating itself to the one-stop solution of low-rise prefabricated houses. The service ranges from architectural design, production, storage, and transportation to installation instructions and after-sales service, etc.



PTH, headquartered in Keqiao District of Shaoxing City, has more than 200 employees and a long history. In 1998, PTH began to produce steel structural parts. In those 10 years, PTH production emphasis has gone through the transformation from the production of door and window fittings to the protection system of houses, then turns to the building structure, and finally upgraded to integrated housing production. After ten years of efforts, the first container house was finished and exported to New Caledonia in 2008. Meanwhile, PTH gradually becomes a leader in the Steel Structure industry. Now, its main products can be divided into four categories, which are steel structure building, light steel villas, custom container house, and Double-C Structure. The annual production capacity for different types of buildings can reach 500,000 square meters.


20ft 40ft Expandable Container House with Solar Energy

Instant House for Residential Community Project in Venezuela

PTH Build Best Prefabricated Hotel Rooms

The Ultimate Guide To Expandable Prefab House

Is It Cheaper To Build A 20ft Expandable Container House