Project Time: 2011
Category: Logistics warehouse
Location: Iraqi
Product: Steel Frame Building
Acreage: 1200sqm
Delivery: 2*40’HQ+1*20’GP
Snow load: 0
Wind load: 0.4KN/㎡
Roof dead load: 0.3KN/㎡
Roof live load: 0.4KN/㎡
Product advantage:
Less pollution for environment:less or no pollution to air,also less or no construction trash at all.Shorter construction period will reduce the inconvenience effect to residence people nearby.
Reduce site management costs:Site management costs can be reduced by 20% to 30% which can lead to a 3% to 4% saving in terms of overall building because of the shorter construction period.