Project No.:PT160374
Time:2016
Location:Philippines
Building area:168 ㎡
Category:Prefab Warehouse
Purpose:warehouse building
Features: warehouse extension on existed building
Features:
It is the first project for SCPA, an extended warehouse next to existed building, excluding wall panel. Surface treatment of main structure:Zinc rich epoxy primer 100um + painting
Roof: 0.5mm PPGI (RAL5015) Considering the strong wind 200km/h, and rigid requirement about quality, we use M30 anchor bolt and take strict quality control for this project.