86-571-83513788 |    inquiry@putianhouse.com
 HOME  |  360° FACTORY VR  |    CONTACTS  |    INQUIRY NOW
Home » News1 » Company News » Why Is The Construction Period of Steel Structure Building Short?
Who We Are

Why Is The Construction Period of Steel Structure Building Short?

As an excellent representative of "green buildings", light steel structure buildings meet almost everyone's needs. So how exactly are steel frame buildings built?


1. Communication design plan


Our professional engineers and designers will design a full set of architectural drawings according to the topography of the customer's house, as well as customer needs and preferences. Strive to build a light steel building house that can avoid waste and can live comfortably for customers.


2. Automatic equipment to produce light steel keel


After the design drawings are finalized, the production of light steel keels will begin. All structural components are cold-formed by the precision machinery assembly line of the light steel production plant. With millimeter-level dimensional accuracy, standardizing the orderly assembly line factory operation can ensure product quality and save production time.


According to the calculation of 4 tons of steel required for a 1-story 100㎡ housing, it can be completed in less than a day. Moreover, the light steel keel is completed by printing, and the "dry method" construction process has no construction waste, which is energy-saving and environmentally friendly!


3. Laying the foundation


Light-weight custom steel buildings are light in weight. Generally, strip foundations or full-page foundations are acceptable. Only a flat cement foundation is required to install light steel structures.


4. Assemble the main keel


Assemble the first-floor wall, splice the second-floor beams, assemble the second-floor wall, and build the second-floor roof. The foundation part is connected by bolts, and the corner column and the combined column are equipped with pull-out bolts. Shear bolts are arranged at a certain structural interval along the horizontal direction of the wall to ensure a stable connection between the house and the foundation.


5. Installation, shotcrete, partition construction


Residential metal buildings' wall

The first wall structure system uses "two plates and one core" (the structural plates are covered on both sides of the light steel keel, and the middle is filled with materials such as rock wool and glass wool). The second type of solid wall is an insulation slurry made of polystyrene particles and concrete through a special process. This thermal insulation slurry has good thermal insulation, heat insulation and sound insulation performance, warm in winter and cool in summer, waterproof, moisture-proof, and dust-proof, and can effectively absorb harmful gases, such as benzene and formaldehyde.


Industrial steel frame buildings' floor

The floor slab is composed of aluminum-zinc-plated steel truss structural members. The floor beams are arranged according to the standard modulus and evenly spaced ribs, so that each layer of the structure forms a structural whole, forming a strong earthquake-resistant floor system. Then use 3D spraying technology for floor construction.


Steel frame structure buildings' roof

The roof adopts a multi-ribbed structure and is composed of light steel components. From the inside to the outside, there are double-layer glass fiber asphalt shingles, SBS waterproof membrane, OSB board, light steel truss, and thermal insulation cotton. The roof is beautiful and generous, with strong bearing capacity.


This is the production and installation process of the entire steel structure building, which is different from the traditional brick-by-tile construction. The materials for light steel construction are all custom-produced in the steel structure building factory. The light steel structure is integrated as a whole through rigorous locking technology on-site, which saves time and effort and is also safe and environmentally friendly. It is currently the most popular construction method.


Rutang ZHANG

I am Rutang Zhang, a seasoned expert in the field of integrated housing with a wealth of experience spanning over 30 years. I have had the privilege of contributing to the success of numerous projects in more than 120 countries and regions. My expertise lies in navigating the intricacies of the integrated housing industry, and I am proud to have played a significant role in delivering successful outcomes across diverse global contexts. From conceptualization to execution, my commitment to excellence has been a driving force in achieving results that meet the unique requirements of each project.
 Tel: +86 180 5752 0109
 Email: cs@putianhouse.com

What We Do

Our Divisions

Project & Case Studies

Send us a Message
Copyright  © 2008-2017 Zhejiang Putian Integrated Housing Co., Ltd. All rights reserved.  Sitemap  Container House Projects        Powered by hi-eweb.com