Project overview: Project No:PT160158
Project time: 2016
Project site: Philippine
Project scale: 72*20ft container+1*8ft container
Product type: container building
Usage: Training school accommodation
Project features: The roof of the box strictly meets the requirements of first-class fire protection, and the pipeline system adopts the method of pipeline well
Project characteristics: The design of this project involves many professions, including architecture, structure, indoor and outdoor water supply and drainage, indoor and outdoor electricity and weak and outdoor rainwater collection and septic tank design. The project difficulty coefficient and quality requirements are relatively high.
The method of box roof and many details are handled by special methods, so that the box roof of this project strictly meets the requirements of first-class fire protection. In addition, the pipeline system of this project adopts the method of pipeline well. In particular, it is necessary to mention that in order to reduce the commissioning workload of on-site installation, we added the method of positioning cones at the bottom of the box, which is often seen in domestic projects. In this project, in order to meet the customer's deodorant function requirements, we adopted the deodorant floor drain method under the drain.